Assembly and testing Posted on March 31, 2021May 25, 2022 by Ryan Several of the new pieces are coming together. Some pictures to show the progress: 12 volt manager with connectors installed12 volt manager installed in side plateTesting of system with DC-DC converterAnother view of the pack without coverView with input/output connectors including those for 12 volt system Post navigation ← Throttle and alternator interceptorInstalling the new system →